Fan Fiction
This story has been set to a rating of R. Age verification is required to proceed.
Chapter 14 – Saturday – The Weekend Away
Tina: Okay Scott, would you like to explain the text message you sent to me which said your client would consider any offer we put forth?
Scott: My client is very motivated to move this building. He was very dependent on the rents from this building to conduct his life. Since the lease terminated, he is in a bit of a bind. Therefore, he is willing to consider any offer at this moment.
Bette: We rode around the neighborhood and we saw several vacant commercial spaces and space for lease signs. I don’t think anything was as large as this but it looks like your client has a lot of competition a far as lease space.
Scott: Yes, I have brought that to his attention. He was considering subdividing this space in order to lease it out. But due to the amount of space available, I think that it would take some time to get suitable tenants for get him where he wants to be.
Tina: And your client is aware of the changing nature of retail operations in the world today. That is big box stores are a dying breed. It’s more convenient for shoppers to go on line and select and purchase consumer goods and have them delivered to their door than to go to a store and purchase them?
Scott: Yes, I have pointed that out to him.
Tina: This building is a good building for what I want to do. I am willing to offer 7.5 million for the building, not subject to financing but subject to an environmental survey and an inspection of the building for structural integrity. We want to know if the existing plumbing is up to code, the electrical supply to the building is adequate and the existing electrical installed is up to code, the condition of the roof and drainage system, and the condition of the air conditioners are adequate and in reasonable condition. We would want a representation from the owner that the building is in compliance with all federal, state and local laws with respect to commercial buildings. Any repairs and maintenance required in excess of $25,000 would be subject to a price adjustment. Any repairs and maintenance individually or in total less than that, we would assume. We would be prepared to close within 10 days of obtaining the environmental report and the inspection report.


Leave a Reply
You must be logged in to post a comment.