Fan Fiction
This story has been set to a rating of R. Age verification is required to proceed.
Chapter 17 – Birthday Week
Tina went in and began to get her sketch pad out and draw out a rough layout of what she wanted. She hoped that it would be enough for the contractors to get started after they made some drawings with measurements and the key placements for plumbing and doors and walls.
The inspector arrived at the door and Tina let him. She introduced herself and he introduced himself as Hank Greenberg. Tina showed Hank around. He then said he would conduct a complete interior inspection and then get his ladder and do a roof inspection and then proceed with a total exterior inspection. He would be opening the dock door and any window which had that capability but would close them prior to leaving. He then said that he would give a verbal report at the end of the inspection and then a written report would be emailed by tomorrow afternoon. Tina agreed to submit the bill to the attorneys and he would be paid next week once the closing occurred. He was fine with that and said the invoice would be submitted with the report.
Tina continued with her drawing until Hank finished. In his verbal report, he was inspecting for existing structure and not for intended or future use. Electrical outlets and lights were all working well; this did not mean they were adequate for the future tenant’s needs. The breaker box was large enough to accommodate a significant amount of expansion, but an electrical contractor would need to make a judgement on future needs. The air conditioning was adequate for the building’s layout, but more offices could cause a need for additional air conditioning. The units themselves were in good working order and had been serviced on a regular basis. The internet connection had been cut off but he saw no problem in the wiring and installation so it should be adequate. There was a reasonable sprinkler system for the existing offices and the open space which looked in good working order; that is no rust or leaks or damage. The roof was a couple of years old and so it would be good for at least another 10 to 15 years minimum of normal wear. The drains were cleaned and working well and empties into the city sewer system and they were adequate to handle roof run-off. No leaks or damage was noted from the roof, windows or doors. On the whole, the building was in excellent shape considering its age and location.


Leave a Reply
You must be logged in to post a comment.