Fan Fiction
This story has been set to a rating of R. Age verification is required to proceed.
Chapter 18 – Home Again
Jim: So, when do you think you are going to close on the house?
Bette: In two weeks. It will be the Friday before Thanksgiving.
Jim: Well, I don’t think that it would be useful to come with you on that trip. No one is going to start any job on the week of Thanksgiving. But I may need to be here the Monday after Thanksgiving to go over things with the contractor. I met with the contractor yesterday and I think we have a deal to start the week after Thanksgiving. This is not the time of year most projects start, so he has some availability. And his rates seem reasonable and he had some good references. And he seemed rather excited to have a project which he could work on during the snow months. But that is going to have a lot to do with how much he can accomplish during December.
Bette: Jim, if you are not sure that garage can be finished by the end of December, post-pone it until March or April and use the existing garage to store material. You really do not want to pour concreate just a couple of days before a huge snow. Work on the demolition work on the house and concentrate on getting the plumbing and electrical roughed in during December. That way the interior finish work and the painting can be done during January and February. Then do the garage, the driveway and build on the back deck during the spring. Then get the furniture and drapes and rugs in and the solar panels in and maybe you will be finished by say the end of May or the first of June.
Jim: Actually, I think that may be the better way to go. It’s going to take a few days to put in the additional beams when those walls come out. And we will want to get the bathrooms laid out and framed in December. Yes, I think that waiting for the garage might be better. If there is any damage as a result of moving materials in and out, well, all of that gets disposed of with demolition.
Bette: Would you be willing to fly on the Sunday after Thanksgiving?
Jim: Yes, sure. I would want to be here Monday morning to kick this project off. I would need to stay a couple of days in order to start lining up paint colors, interior finishes and drapes and rugs. I would want to be here when the contractor framed in the new walls and placed the new plumbing. So, I would be here at least a week, possibly two.


Leave a Reply
You must be logged in to post a comment.